The Challenge

Where it started.

Pure Watercraft's electric marine powertrain required cost engineering across stamping, injection molding, wire harness, die casting, and machining — at startup volumes.

SPEND DEPLOYED $60M total spend
CSC Approach

What we did.

Startup manufacturing cost modeling. Should-cost benchmarks tuned for early-stage volumes. Supplier qualification through CSC's network — qualified suppliers willing to engage at startup scale.

01 Diagnose Should-cost · Teardown 02 Source Supplier network · RFQ 03 Implement Negotiation · APQP · PO
The Outcome

Result.

$8M saved (13–15%) on $60M of spend. Cost benchmarks scaled with volume ramp.

SAVINGS DELIVERED $8.0M on $60M spend SPEND 14% reduction
More cases

Related work.

Your case next

Send 5 parts. We share in the savings — not in the upfront cost.

Book a discovery call →