Pure Watercraft's electric marine powertrain required cost engineering across stamping, injection molding, wire harness, die casting, and machining — at startup volumes.
Startup manufacturing cost modeling. Should-cost benchmarks tuned for early-stage volumes. Supplier qualification through CSC's network — qualified suppliers willing to engage at startup scale.
$8M saved (13–15%) on $60M of spend. Cost benchmarks scaled with volume ramp.